Country
Iraq: LNG infrastructure
Iraq has 2 LNG terminals and 43 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
operating regasification
Pipelines
43
12,530 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 2 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Iraq
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Al-Faw FSRU TerminalBasrah Governorate | Import | FSRU | Proposed | 7.6 Mtpaproposed | 1 | — |
| Khor Al-Zubair FSRU | Import | FSRU | Proposed | 3.8 Mtpaproposed | 1 | — |
Gas pipelines crossing Iraq
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Al-Ahdab-Al-Zubaydia PWR St Gas PipelineWasit → Al-Zubaydia | Iraq | Operating | 117 km | Not reported | 1 | — |
| Artawi GMP EPSCC Gas PipelinesBasrah → Basrah | Iraq | Proposed | 83 km | Not reported | 1 | — |
| Artawi GMP EPSCC Gas PipelinesBasrah → Basrah | Iraq | Proposed | 114 km | Not reported | 1 | — |
| Badra Oil Field–Wassit PS Gas PipelineWassit → Wassit | Iraq | Operating | 107 km | Not reported | 1 | — |
| Baiji-K3-Al Kaem Gas PipelineBaiji → Al-Qa'im | Iraq | Operating | 268 km | 0.02 bcm/y | 1 | — |
| Baiji-Mosul Gas PipelineSaladin → Al Mushraq | Iraq | Operating | 108 km | 1.64 bcm/y | 1 | — |
| Baiji-Mosul Gas PipelineBaiji → Mosul | Iraq | Operating | 170 km | Not reported | 1 | — |
| Baiji-Mosul Gas PipelineMainline → Al-Qayyarah power station | Iraq | Operating | 22 km | Not reported | 1 | — |
| Basra-Ceyhan Gas PipelineBasra → Ceyhan terminal | Iraq, Türkiye | Proposed | 1,734 km | 5 bcm/y | 1 | — |
| Bazargan-Halfaya Gas PipelineBazargan → Halfaya | Iraq | Under construction | 70 km | 0.72 bcm/y | 1 | — |
| Erbil-Duhok Gas PipelineKurdistan → Duhok | Iraq | Under construction | 117 km | Not reported | 1 | — |
| Faiha-North Rumaila Gas PipelineBasrah → North Rumaila oil field | Iraq | Under construction | 42 km | 0.99 bcm/y | 1 | — |
| Iran-Iraq Gas PipelineAbadan → Basrah | Iran, Iraq | Operating | 17 km | 0.36 bcm/y | 1 | 2017 |
| Iran–Iraq–Syria Gas PipelineAsaluyeh → Damascus | Iran, Iraq, Syria, Lebanon | Cancelled | 5,600 km | 40.1 bcm/y | 1 | — |
| Iraq National Gas PipelineNasiriyah → Basra | Iraq | Operating | 170 km | 11 bcm/y | 1 | — |
| Iraq National Gas PipelineBayji → Nasiriyah | Iraq | Operating | 470 km | 8.69 bcm/y | 1 | — |
| Iraq National Gas Pipeline | Iraq | Operating | 40 km | Not reported | 1 | — |
| Iraq National Gas Pipeline | Iraq | Operating | 119 km | Not reported | 1 | — |
| Iraq National Gas Pipeline | Iraq | Operating | 80 km | Not reported | 1 | — |
| Iraq National Gas Pipeline | Iraq | Operating | 47 km | Not reported | 1 | — |
| Iraq-Kuwait Gas Pipeline | Iraq, Kuwait | Cancelled | 97 km | 2.06 bcm/y | 1 | — |
| Kabesa Cement Gas Pipeline | Iraq | Operating | 39 km | 0.67 bcm/y | 1 | — |
| Khor Al-Zubair-Hartha Gas PipelineBasrah → Hartha | Iraq | Operating | 77 km | 4.8 bcm/y | 1 | — |
| Khor Al-Zubair-Shatt Al Arab Gas PipelineBasrah → Basrah | Iraq | Operating | 40 km | 2.04 bcm/y | 1 | — |
| Khormor-Erbil Gas PipelineKurdistan → Erbil | Iraq | Operating | 140 km | Not reported | 1 | — |
| Khormor-Jambur-Kirkuk Gas PipelineSulaymaniyah → Kirkuk | Iraq | Operating | 1,050 km | 1.02 bcm/y | 1 | 1980 |
| Mahmudiyah-Besmaya Gas PipelineMahmudiyah → Besmaya | Iraq | Under construction | 43 km | 8.18 bcm/y | 1 | — |
| Mishraq Cross Road-Mousil PWR ST Gas PipelineMosul → Mosul | Iraq | Operating | 61 km | Not reported | 1 | — |
| Naft Khana-Baghdad Gas PipelineNaft Khana → Baghdad | Iraq | Operating | 117 km | 3.58 bcm/y | 1 | — |
| Najaf Cement Factory Gas PipelineNajaf → Al-Ashraf Najaf Cement Factory. | Iraq | Operating | 1.2 km | Not reported | 1 | 2024 |
| North Gas-Baiji Gas PipelineKirkuk → Baiji | Iraq | Operating | 145 km | 0.89 bcm/y | 1 | — |
| North Gas-K1 Gas Pipeline | Iraq | Operating | 20 km | 5.26 bcm/y | 1 | — |
| North Gas-Taji Gas Pipeline | Iraq | Operating | 272 km | 1.53 bcm/y | 1 | — |
| North Rumela-Al-Najaf Gas PipelineBasrah → Al-Najaf | Iraq | Shelved | 350 km | 94.2 bcm/y | 1 | — |
| North Rumela-Khor Al-Zubair Gas PipelineRumela Oil field → Khor Al Zubair | Iraq | Operating | 87 km | 10 bcm/y | 1 | — |
| Okaz–Al-Anbar Gas PipelineAl Anbar → Al Anbar | Iraq | Proposed | 19 km | Not reported | 1 | — |
| Okaz–Al-Anbar Gas PipelinesAl-Anbar → Al-Anbar | Iraq | Proposed | 97 km | Not reported | 1 | — |
| Okaz–Al-Anbar Gas PipelinesAl-Anbar → Al Anbar power plant | Iraq | Proposed | 90 km | Not reported | 1 | — |
| Shouibah-Khor Al-Zubair Gas PipelineShouibah → Basrah | Iraq | Operating | 46 km | Not reported | 1 | — |
| Taji-Duara Gas PipelineBaghdad → Dora | Iraq | Operating | 32 km | 0.96 bcm/y | 1 | — |
| Taji-South Baghdad Gas PipelineBaghdad → Baghdad | Iraq | Operating | 56 km | 2 bcm/y | 1 | — |
| West Qurna-Rumela Gas Pipeline | Iraq | Under construction | 50 km | Not reported | 1 | 2025 |
| Zubair-Faw Gas Pipeline IraqBasrah → Al Faw | Iraq | Shelved | 105 km | 1.02 bcm/y | 1 | — |