LNG Chain

Gas transmission pipeline · Basrah to Basrah

Artawi GMP EPSCC Gas Pipelines

Artawi GMP EPSCC Gas Pipelines is a proposed gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 83 km long. It runs from Basrah to Basrah. It is owned by Iraq Ministry of Oil.

Length

83 km

Capacity

Not reported

Segments tracked

1

Largest diameter 508 mm (20 in)

Route

Artawi GMP EPSCC Gas Pipelines runs from Basrah to Basrah. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Basrah
To
Basrah
Start country
Iraq
End country
Iraq
Countries crossed
Iraq
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
65 km
GEM pipeline ID
P7436
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Pipeline 1ProposedBasrah → Basrah83Not reported508 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.