Gas transmission pipeline · Basrah to Basrah
Khor Al-Zubair-Shatt Al Arab Gas Pipeline
Khor Al-Zubair-Shatt Al Arab Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 40 km long and 2.04 bcm/y of capacity. It runs from Basrah to Basrah. It is owned by Iraq Ministry of Oil.
Length
40 km
Capacity
2.04 bcm/y
1.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Khor Al-Zubair-Shatt Al Arab Gas Pipeline runs from Basrah to Basrah. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Basrah
- To
- Basrah
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 37 km
- GEM pipeline ID
- P7435
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Operating | Basrah → Basrah | 40 | 2.04 | 1067 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Khor Al-Zubair FSRU | Iraq | Import | Proposed | 0.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Khor Al-Zubair-Shatt Al Arab Gas Pipeline run?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline runs from Basrah to Basrah, crossing Iraq.
- How long is Khor Al-Zubair-Shatt Al Arab Gas Pipeline?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline is 40 km long.
- How much gas can Khor Al-Zubair-Shatt Al Arab Gas Pipeline carry?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline has a design capacity of 2.04 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Khor Al-Zubair-Shatt Al Arab Gas Pipeline operating?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline is operating.
- Who owns Khor Al-Zubair-Shatt Al Arab Gas Pipeline?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline is owned by Iraq Ministry of Oil, as recorded in the current tracker release.
- Does Khor Al-Zubair-Shatt Al Arab Gas Pipeline serve an LNG terminal?
- Khor Al-Zubair-Shatt Al Arab Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.