Gas transmission pipeline · Sulaymaniyah to Kirkuk
Khormor-Jambur-Kirkuk Gas Pipeline
Khormor-Jambur-Kirkuk Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 1,050 km long and 1.02 bcm/y of capacity, starting up in 1980. It runs from Sulaymaniyah to Kirkuk.
Length
1,050 km
Capacity
1.02 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Khormor-Jambur-Kirkuk Gas Pipeline runs from Sulaymaniyah to Kirkuk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sulaymaniyah
- To
- Kirkuk
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 93 km
- GEM pipeline ID
- P6827
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Sulaymaniyah → Kirkuk | 1,050 | 1.02 | 406 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Khormor-Jambur-Kirkuk Gas Pipeline run?
- Khormor-Jambur-Kirkuk Gas Pipeline runs from Sulaymaniyah to Kirkuk, crossing Iraq.
- How long is Khormor-Jambur-Kirkuk Gas Pipeline?
- Khormor-Jambur-Kirkuk Gas Pipeline is 1,050 km long.
- How much gas can Khormor-Jambur-Kirkuk Gas Pipeline carry?
- Khormor-Jambur-Kirkuk Gas Pipeline has a design capacity of 1.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Khormor-Jambur-Kirkuk Gas Pipeline operating?
- Khormor-Jambur-Kirkuk Gas Pipeline is operating, having started in 1980.
- Who owns Khormor-Jambur-Kirkuk Gas Pipeline?
- Ownership of Khormor-Jambur-Kirkuk Gas Pipeline is not reported in the current tracker release.