Gas transmission pipeline · Karachi to Sawan
Karachi–Sawan Gas Pipeline
Karachi–Sawan Gas Pipeline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 371 km long and 12.26 bcm/y of capacity, starting up in 2018. It runs from Karachi to Sawan. It is owned by Sui Southern Gas Co (SSGC).
Length
371 km
Capacity
12.3 bcm/y
9.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Karachi–Sawan Gas Pipeline runs from Karachi to Sawan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Karachi
- To
- Sawan
- Start country
- Pakistan
- End country
- Pakistan
- Countries crossed
- Pakistan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 290 km
- GEM pipeline ID
- P3177
- Start year
- 2018
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Karachi → Sawan | 371 | 12.3 | 1067 mm | 2018 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Energas FSRU | Pakistan | Import | Proposed | 1.8 km | route proximity |
| GasPort FSRU 2 | Pakistan | Import | Proposed | 1.8 km | route proximity |
| Engro FSRU 2 | Pakistan | Import | Cancelled | 2.2 km | route proximity |
| Mashal LNG Terminal | Pakistan | Import | Cancelled | 2.2 km | route proximity |
| GEIL FSRU | Pakistan | Import | Cancelled | 2.5 km | route proximity |
| GasPort FSRU | Pakistan | Import | Operating | 5.9 km | route proximity |
| Tabeer LNG Terminal | Pakistan | Import | Shelved | 15.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Karachi–Sawan Gas Pipeline run?
- Karachi–Sawan Gas Pipeline runs from Karachi to Sawan, crossing Pakistan.
- How long is Karachi–Sawan Gas Pipeline?
- Karachi–Sawan Gas Pipeline is 371 km long.
- How much gas can Karachi–Sawan Gas Pipeline carry?
- Karachi–Sawan Gas Pipeline has a design capacity of 12.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Karachi–Sawan Gas Pipeline operating?
- Karachi–Sawan Gas Pipeline is operating, having started in 2018.
- Who owns Karachi–Sawan Gas Pipeline?
- Karachi–Sawan Gas Pipeline is owned by Sui Southern Gas Co (SSGC), as recorded in the current tracker release.
- Does Karachi–Sawan Gas Pipeline serve an LNG terminal?