LNG Chain

Import terminal · Jiangsu, China

Rudong LNG Terminal (GCL-Poly)

Rudong LNG Terminal (GCL-Poly) is an under construction LNG import terminal in Jiangsu, China. The tracker lists 2 tracked units with 3.5 Mtpa under construction, 0.25 Mtpa proposed. It is owned by GCL Huidong LNG Rudong Co Ltd and Kunlun GCL Huidong LNG Terminal Rudong Co Ltd.

Operating

no units operating

Under construction

3.5 Mtpa

4.76 bcm/y · 1 unit

Proposed

0.25 Mtpa

0.34 bcm/y · 1 unit

At a glance

Country
China
State / province
Jiangsu
Region
Not reported
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Under construction
Trains / phases tracked
2
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
32.5268° N, 121.4127° E
GEM terminal ID
T100000130403
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit Phase 1Under construction3.54.76Not reportedGCL Huidong LNG Rudong Co Ltd [100%]; Kunlun GCL Huidong LNG Terminal Rudong Co Ltd
Unit Phase 2Proposed0.250.34Not reportedGCL Huidong LNG Rudong Co Ltd [100%]; Kunlun GCL Huidong LNG Terminal Rudong Co Ltd

Capacity by status

StatusUnitsMtpabcm/y
Under construction13.54.76
Proposed10.250.34

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Rudong LNG Terminal (GCL-Poly) at 32.5268° N, 121.4127° E, with 4 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
32.5268° N, 121.4127° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Jiangsu Coastal Gas PipelineOperating89 km1.84 bcm/y0.8 kmroute proximity
Jiangsu Coastal Gas PipelineOperating171 km6.16 bcm/y1 kmroute proximity
Jiangsu Coastal Gas PipelineProposed92 km6 bcm/y13.4 kmroute proximity
Jiangsu Coastal Gas PipelineCancelled639 km1.2 bcm/y16.5 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

  • Strait of Malacca
  • Strait of Hormuz
  • Panama Canal
  • Lombok Strait
  • Taiwan Strait

Cargoes reach north-east Asia from the Middle East, Australia, the United States and Russia, so exposure is spread.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Rudong LNG Terminal (GCL-Poly)?
Rudong LNG Terminal (GCL-Poly) is an LNG import terminal in Jiangsu, China. It is made up of 2 tracked trains and phases.
Is Rudong LNG Terminal (GCL-Poly) operating?
Rudong LNG Terminal (GCL-Poly) is under construction. Nothing here should be read as a forecast that it will be built.
How much LNG can Rudong LNG Terminal (GCL-Poly) handle?
Rudong LNG Terminal (GCL-Poly) has 3.5 Mtpa under construction, 0.25 Mtpa proposed. Capacity at different statuses is never added together.
Who owns Rudong LNG Terminal (GCL-Poly)?
Rudong LNG Terminal (GCL-Poly) is owned by GCL Huidong LNG Rudong Co Ltd and Kunlun GCL Huidong LNG Terminal Rudong Co Ltd. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Rudong LNG Terminal (GCL-Poly) pass?
Cargoes from Rudong LNG Terminal (GCL-Poly) would normally pass Strait of Malacca, Strait of Hormuz, Panama Canal, Lombok Strait and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Rudong LNG Terminal (GCL-Poly)?
4 tracked gas pipelines pass within 25 km of Rudong LNG Terminal (GCL-Poly). Proximity is not proof of a physical connection; each match is listed with its distance.