Gas transmission pipeline · Rudong LNG to Chongming District
Jiangsu Coastal Gas Pipeline
Jiangsu Coastal Gas Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 89 km long and 1.84 bcm/y of capacity, starting up in 2017. It runs from Rudong LNG to Chongming District.
Length
89 km
Capacity
1.84 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Jiangsu Coastal Gas Pipeline runs from Rudong LNG to Chongming District. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Rudong LNG
- To
- Chongming District
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 139 km
- GEM pipeline ID
- P5995
- Start year
- 2017
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Rudong-Haimen-Chongming Island Gas Pipeline | Operating | Rudong LNG → Chongming District | 89 | 1.84 | 610 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Rudong LNG Terminal (PetroChina) | China | Import | Operating | 0.3 km | route proximity |
| Rudong LNG Terminal (China Resources) | China | Import | Under construction | 0.6 km | route proximity |
| Lianyungang LNG Terminal | China | Import | Cancelled | 0.8 km | route proximity |
| Rudong LNG Terminal (GCL-Poly) | China | Import | Under construction | 0.8 km | route proximity |
| Rudong LNG Terminal (Jiangsu Guoxin) | China | Import | Under construction | 0.8 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Jiangsu Coastal Gas Pipeline run?
- Jiangsu Coastal Gas Pipeline runs from Rudong LNG to Chongming District, crossing China.
- How long is Jiangsu Coastal Gas Pipeline?
- Jiangsu Coastal Gas Pipeline is 89 km long.
- How much gas can Jiangsu Coastal Gas Pipeline carry?
- Jiangsu Coastal Gas Pipeline has a design capacity of 1.84 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Jiangsu Coastal Gas Pipeline operating?
- Jiangsu Coastal Gas Pipeline is operating, having started in 2017.
- Who owns Jiangsu Coastal Gas Pipeline?
- Ownership of Jiangsu Coastal Gas Pipeline is not reported in the current tracker release.
- Does Jiangsu Coastal Gas Pipeline serve an LNG terminal?
- Jiangsu Coastal Gas Pipeline passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.