Export terminal · Mauritania
Greater Tortue Ahmeyim FLNG Terminal
Greater Tortue Ahmeyim FLNG Terminal is an operating LNG export terminal (floating liquefaction (FLNG) facility) in Mauritania. The tracker lists 2 tracked units with 2.5 Mtpa operating, 3 Mtpa proposed, the earliest starting in 2025. Owners include BP, Kosmos Energy Ltd, Societé des Petroles du Sénégal and 1 other.
Operating
2.5 Mtpa
3.4 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
3 Mtpa
4.08 bcm/y · 1 unit
At a glance
- Country
- Mauritania
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- FLNG
- Status (rolled up)
- Operating
- Trains / phases tracked
- 2
- Earliest start year
- 2025
- Latest start year
- 2025
- Coordinates
- 16.0651° N, 16.6029° W
- GEM terminal ID
- T100000130661
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Operating | 2.5 | 3.4 | 2025 | — | Not reported | BP PLC [56.29%]; Kosmos Energy Ltd [26.71%]; Societé des Petroles du Sénégal [10%]; Société Mauritanienne des Hydrocarbures SA [7%] |
| Unit Phase 2 | Proposed | 3 | 4.08 | — | — | Not reported | BP PLC [56.29%]; Kosmos Energy Ltd [26.71%]; Societé des Petroles du Sénégal [10%]; Société Mauritanienne des Hydrocarbures SA [7%] |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Greater Tortue Ahmeyim FLNG Terminal at 16.0651° N, 16.6029° W, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 16.0651° N, 16.6029° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Greater Philadelphia Expansion Project | Shelved | 56 km | 4.85 bcm/y | — | name match |