Import terminal · Louisiana, United States
Creole Trail LNG Terminal
Creole Trail LNG Terminal is a cancelled LNG import terminal in Louisiana, United States. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Cheniere Energy.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- United States
- State / province
- Louisiana
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 29.8500° N, 93.2000° W
- GEM terminal ID
- T100000130645
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 27 | 36.7 | — | — | Not reported | Cheniere Energy Inc [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 27 | 36.7 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Cheniere Energy100%
Location
Creole Trail LNG Terminal at 29.8500° N, 93.2000° W, with 15 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 29.8500° N, 93.2000° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Natural Gas Pipeline Company of America System | Operating | 14,645 km | 16.35 bcm/y | 3 km | route proximity |
| ANR Gas Pipeline | Operating | 2,897 km | 61.32 bcm/y | 3.4 km | route proximity |
| CP Express Pipeline | Under construction | 147 km | 40.88 bcm/y | 4.5 km | route proximity |
| Kinetica Energy Express | Operating | 1,139 km | — | 4.7 km | route proximity |
| TransCameron Pipeline | Operating | 39 km | 19.42 bcm/y | 7.2 km | route proximity |
| Bridgeline Gas Pipeline | Operating | 1,585 km | 9.4 bcm/y | 7.9 km | route proximity |
| Columbia Gulf Transmission Pipeline | Operating | 5,360 km | — | 8.4 km | route proximity |
| Gulf South Gas Pipeline | Operating | 12,070 km | 27.59 bcm/y | 10.1 km | route proximity |
| Creole Trail Pipeline | Operating | 151 km | 15.33 bcm/y | 11.3 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 15.8 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 19.1 km | route proximity |
| ANR Gas Pipeline | Idle | 64 km | 7.39 bcm/y | 21 km | route proximity |
| Texas Gas Transmission Pipeline | Operating | 9,616 km | 62.34 bcm/y | 21.5 km | route proximity |
| Transcontinental Gas Pipeline | Operating | 10,200 km | 171.7 bcm/y | 23.8 km | route proximity |
| Creole Trail Pipeline | Cancelled | 168 km | 15.33 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Creole Trail LNG Terminal?
- Creole Trail LNG Terminal is an LNG import terminal in Louisiana, United States. It is made up of 1 tracked train or phase.
- Is Creole Trail LNG Terminal operating?
- Creole Trail LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Creole Trail LNG Terminal handle?
- Global Energy Monitor reports no capacity for Creole Trail LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Creole Trail LNG Terminal?
- Creole Trail LNG Terminal is owned by Cheniere Energy. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Creole Trail LNG Terminal pass?
- Cargoes from Creole Trail LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Creole Trail LNG Terminal?
- 15 tracked gas pipelines pass within 25 km of Creole Trail LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.