LNG Chain

Gas transmission pipeline · Vietnam

Thi Vai Import Terminal Gas Pipeline

Thi Vai Import Terminal Gas Pipeline is an operating gas transmission pipeline in Vietnam. The tracker lists 1 tracked segment, 12 km long and 4.5 bcm/y of capacity, starting up in 2023.

Length

12 km

Capacity

4.5 bcm/y

3.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 457 mm (18 in)

Route

Thi Vai Import Terminal Gas Pipeline runs from Vietnam. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Thi Vai Import Terminal
To
Not reported
Start country
Vietnam
End country
Vietnam
Countries crossed
Vietnam
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
23 km
GEM pipeline ID
P3146
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingThi Vai Import Terminal → ?124.5457 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cai Mep LNG TerminalVietnamImportOperating1.2 kmroute proximity
Thi Vai LNG TerminalVietnamImportOperating2.2 kmroute proximity
Long Son LNG TerminalVietnamImportProposed7.9 kmroute proximity
Hiep Phuoc LNG TerminalVietnamImportUnder construction22.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Thi Vai Import Terminal Gas Pipeline run?
Thi Vai Import Terminal Gas Pipeline is recorded in Vietnam. Global Energy Monitor reports no start and end points for it.
How long is Thi Vai Import Terminal Gas Pipeline?
Thi Vai Import Terminal Gas Pipeline is 12 km long.
How much gas can Thi Vai Import Terminal Gas Pipeline carry?
Thi Vai Import Terminal Gas Pipeline has a design capacity of 4.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Thi Vai Import Terminal Gas Pipeline operating?
Thi Vai Import Terminal Gas Pipeline is operating, having started in 2023.
Who owns Thi Vai Import Terminal Gas Pipeline?
Ownership of Thi Vai Import Terminal Gas Pipeline is not reported in the current tracker release.
Does Thi Vai Import Terminal Gas Pipeline serve an LNG terminal?
Thi Vai Import Terminal Gas Pipeline passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.