LNG Chain

Gas transmission pipeline · Vietnam

Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline

Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline is an operating gas transmission pipeline in Vietnam. The tracker lists 1 tracked segment, 40 km long and 2 bcm/y of capacity, starting up in 2008. It is owned by PetroVietnam.

Length

40 km

Capacity

2 bcm/y

1.5 Mtpa LNG equivalent

Segments tracked

1

Route

Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline runs from Vietnam. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Ba Ria Vung Tau
Start country
Vietnam
End country
Vietnam
Countries crossed
Vietnam
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
124 km
GEM pipeline ID
P2701
Start year
2008
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperating? → Ba Ria Vung Tau4022008GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Long Son LNG TerminalVietnamImportProposed18.3 kmroute proximity
Thi Vai LNG TerminalVietnamImportOperating22.4 kmroute proximity
Cai Mep LNG TerminalVietnamImportOperating23.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline run?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline is recorded in Vietnam. Global Energy Monitor reports no start and end points for it.
How long is Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline is 40 km long.
How much gas can Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline carry?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline has a design capacity of 2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline operating?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline is operating, having started in 2008.
Who owns Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline is owned by PetroVietnam, as recorded in the current tracker release.
Does Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline serve an LNG terminal?
Su Tu Vang-Rang Dong–Bach Ho-Long Hai -Dinh Co Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.