Gas transmission pipeline · Rogatec to Gorizia
Rogatec–Gorizia Gas Pipeline
Rogatec–Gorizia Gas Pipeline is an operating gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 91 km long and 1.91 bcm/y of capacity. It runs from Rogatec to Gorizia. It is owned by Plinovodi doo.
Length
91 km
Capacity
1.91 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 800 mm (31 in)
Route
Rogatec–Gorizia Gas Pipeline runs from Rogatec to Gorizia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Rogatec
- To
- Gorizia
- Start country
- Slovenia
- End country
- Italy
- Countries crossed
- Slovenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 91 km
- GEM pipeline ID
- P4326
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Vodice-Gorizia | Operating | Rogatec → Gorizia | 91 | 1.91 | 800 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Trieste Monfalcone LNG Terminal | Italy | Import | Cancelled | 16.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinovodi doo100%
Parent companies
- Plinhold doo100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Rogatec–Gorizia Gas Pipeline run?
- Rogatec–Gorizia Gas Pipeline runs from Rogatec to Gorizia, crossing Slovenia.
- How long is Rogatec–Gorizia Gas Pipeline?
- Rogatec–Gorizia Gas Pipeline is 91 km long.
- How much gas can Rogatec–Gorizia Gas Pipeline carry?
- Rogatec–Gorizia Gas Pipeline has a design capacity of 1.91 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Rogatec–Gorizia Gas Pipeline operating?
- Rogatec–Gorizia Gas Pipeline is operating.
- Who owns Rogatec–Gorizia Gas Pipeline?
- Rogatec–Gorizia Gas Pipeline is owned by Plinovodi doo, as recorded in the current tracker release.
- Does Rogatec–Gorizia Gas Pipeline serve an LNG terminal?
- Rogatec–Gorizia Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.