Gas transmission pipeline · Šempeter to Vodice
Hungary-Slovenia-Italy Interconnector Gas Pipeline
Hungary-Slovenia-Italy Interconnector Gas Pipeline is a shelved gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 101 km long, starting up in 2026. It runs from Šempeter to Vodice. It is owned by Plinovodi doo.
Length
101 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1092 mm (43 in)
Route
Hungary-Slovenia-Italy Interconnector Gas Pipeline runs from Šempeter to Vodice. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Šempeter
- To
- Vodice
- Start country
- Slovenia
- End country
- Slovenia
- Countries crossed
- Slovenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 85 km
- GEM pipeline ID
- P1711
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Šempeter-Vodice Gas Pipeline | Shelved | Šempeter → Vodice | 101 | Not reported | 1092 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Trieste Monfalcone LNG Terminal | Italy | Import | Cancelled | 16.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinovodi doo100%
Parent companies
- Plinhold doo100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hungary-Slovenia-Italy Interconnector Gas Pipeline run?
- Hungary-Slovenia-Italy Interconnector Gas Pipeline runs from Šempeter to Vodice, crossing Slovenia.
- How long is Hungary-Slovenia-Italy Interconnector Gas Pipeline?
- Hungary-Slovenia-Italy Interconnector Gas Pipeline is 101 km long.
- How much gas can Hungary-Slovenia-Italy Interconnector Gas Pipeline carry?
- No design capacity is reported for Hungary-Slovenia-Italy Interconnector Gas Pipeline. That is an absent figure, not a zero.
- Is Hungary-Slovenia-Italy Interconnector Gas Pipeline operating?
- Hungary-Slovenia-Italy Interconnector Gas Pipeline is shelved, with a reported start year of 2026.
- Who owns Hungary-Slovenia-Italy Interconnector Gas Pipeline?
- Hungary-Slovenia-Italy Interconnector Gas Pipeline is owned by Plinovodi doo, as recorded in the current tracker release.
- Does Hungary-Slovenia-Italy Interconnector Gas Pipeline serve an LNG terminal?
- Hungary-Slovenia-Italy Interconnector Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.