Country
Saudi Arabia: LNG infrastructure
Saudi Arabia has 40 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
40
8,672 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Saudi Arabia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| A47-Yanbu Gas PipelineRiyadh → Yanbu | Saudi Arabia | Operating | 966 km | Not reported | 1 | — |
| AY–1 KP 943-Riyadh Gas PipelineRiyadh → Riyadh | Saudi Arabia | Operating | 153 km | Not reported | 1 | — |
| Abqaiq-B-Shedgum Gas PipelineAbqaiq → Shedgum Gas Plant | Saudi Arabia | Operating | 53 km | Not reported | 1 | — |
| Abqaiq-Berri Gas PipelineAbqaiq Plant → Berri Gas Plant | Saudi Arabia | Operating | 137 km | Not reported | 1 | — |
| Abu Ali-Khursaniyah Gas PipelineAbu Ali Gas Oil Separation Plant → Khursaniyah Gas Plant | Saudi Arabia | Operating | 44 km | 2.25 bcm/y | 1 | — |
| Abu Ali-Khursaniyah Gas PipelineAbu Ali Gas Oil Separation Plant → Khursaniyah Gas Plant | Saudi Arabia | Operating | 22 km | 2.25 bcm/y | 1 | — |
| Aindar-Shedgum Gas PipelineAindar → Shedgum Gas Plant | Saudi Arabia | Operating | 34 km | Not reported | 1 | — |
| Berri-Abu Ali 2 Gas PipelineBerri Gas Plant → Abu Ali Island | Saudi Arabia | Operating | 39 km | Not reported | 1 | 2009 |
| Berri-Abu Ali Gas PipelineBerri Gas Plant → Abu Ali Island | Saudi Arabia | Operating | 39 km | Not reported | 1 | 2009 |
| East–West Gas Pipeline (Saudi Arabia)Eastern Province → Yanbu | Saudi Arabia | Operating | 1,200 km | Not reported | 1 | 1978 |
| Haradh Khuff-Hawiyah 2 Gas PipelineNorth Haradh Kuff Gas → Hawiyah Gas Plant | Saudi Arabia | Operating | 43 km | Not reported | 1 | — |
| Haradh Khuff-Hawiyah 3 Gas PipelineNorth Haradh Kuff Gas → Hawiyah Gas Plant | Saudi Arabia | Operating | 43 km | Not reported | 1 | — |
| Haradh Khuff-Hawiyah Gas PipelineNorth Haradh Kuff Gas → Hawiyah Gas Plant | Saudi Arabia | Operating | 43 km | Not reported | 1 | — |
| Haradh-3-Uthmaniya Gas PipelineEastern Province → Uthmaniyah Gas Plant | Saudi Arabia | Operating | 124 km | Not reported | 1 | 2006 |
| Haradh-Uthmaniya Gas PipelineHaradh Gas Plant → Uthmaniyah Gas Plant | Saudi Arabia | Operating | 140 km | Not reported | 1 | 2006 |
| Hasbah-Wasit Gas PipelinesHasbah Gas Field → Wasit Gas Plant | Saudi Arabia | Operating | 160 km | 0.01 bcm/y | 1 | 2017 |
| Hasbah-Wasit Gas PipelinesHasbah Gas Field → Wasit Gas Plant | Saudi Arabia | Operating | 160 km | 0.01 bcm/y | 1 | 2017 |
| Hawiyah-UBTG-1-km0 Gas PipelineHawiyah Gas Plant → Uthmaniyah Gas Plant | Saudi Arabia | Operating | 56 km | Not reported | 1 | — |
| Hawiyah-Uthmniyah Gas PipelineHawiyah Gas Plant → Uthmaniyah Gas Plant | Saudi Arabia | Operating | 47 km | Not reported | 1 | — |
| Juaymah-Jubail Gas PipelineJuaymah → Jubail | Saudi Arabia | Operating | 56 km | 8.38 bcm/y | 1 | — |
| MGS III Gas PipelinesAl Madinah → Makkah | Saudi Arabia | Under construction | 192 km | Not reported | 1 | 2028 |
| Madrakah–Al Hawiyah Gas PipelineMidrikah remote header B → Hawiyah Gas Plant | Saudi Arabia | Operating | 450 km | 2.96 bcm/y | 1 | 2024 |
| Marjan GOSP-4 Gas PipelineMarjan GOSP-4 → Tanajib Gas Plant | Saudi Arabia | Operating | 531 km | 0.01 bcm/y | 1 | 2024 |
| Pump Station 06-Qassim PS Gas PipelinePump Station 06 → Qassim Power Station | Saudi Arabia | Operating | 226 km | Not reported | 1 | 2021 |
| Pump Station 07-Pump Station 11 Gas PipelinePump Station 07 → Pump Station 11 | Saudi Arabia | Operating | 422 km | Not reported | 1 | 2021 |
| Qatar-Turkey Gas PipelineNorth Field → Nabucco Pipeline | Qatar, Saudi Arabia, Jordan, Syria, Türkiye | Cancelled | 1,500 km | Not reported | 1 | — |
| Qatif North-Berri Gas PipelineQatif North → Berri Gas Plant | Saudi Arabia | Operating | 45 km | Not reported | 1 | — |
| Safianayh-Ju’aymah Gas PipelineSafaniyah Plant → Ju’aymah Plant | Saudi Arabia | Operating | 198 km | Not reported | 1 | — |
| Shedgum-Riyadh Gas Pipeline 2BGCS 3 → KM 245.2 | Saudi Arabia | Operating | 40 km | Not reported | 1 | 2021 |
| Shedgum-Riyadh Gas Pipeline 3EWPS 1 → BGCS 3 | Saudi Arabia | Operating | 150 km | Not reported | 1 | 2021 |
| Tanajib-Berri Gas PipelineTanajib Gas Plant → Berri Gas Plant | Saudi Arabia | Operating | 145 km | Not reported | 1 | — |
| Tinat Kuff-Haradh Gas PipelineTinat Kuff Gas → Haradh Gas Plant | Saudi Arabia | Operating | 43 km | Not reported | 1 | — |
| UBTG-1-Berri 2 Gas PipelineUthmaniyah Gas Plant → Berri Gas Plant | Saudi Arabia | Operating | 247 km | Not reported | 1 | — |
| UBTG-1-Berri Gas PipelineUthmaniyah Gas Plant → Berri Gas Plant | Saudi Arabia | Operating | 249 km | Not reported | 1 | — |
| UBTG-1-km0-UBTG-1-km56 2 Gas PipelineUthmaniyah Gas Plant → Shedgum Gas Plant | Saudi Arabia | Operating | 56 km | Not reported | 1 | — |
| UBTG-1-km0-UBTG-1-km56 Gas PipelineUthmaniyah Gas Plant → Shedgum Gas Plant | Saudi Arabia | Operating | 56 km | Not reported | 1 | — |
| UBTG-1km-Juanymah Gas PipelineUthmaniyah Gas Plant → Ju’aymah | Saudi Arabia | Operating | 204 km | Not reported | 1 | — |
| UBTG-km56-AY-1 KP916 Gas PipelineShedgum Gas Plant → Riyadh | Saudi Arabia | Operating | 244 km | Not reported | 1 | — |
| Wafra-Station 171 Gas PipelineWafra Joint Operations → BS 171 | Kuwait, Saudi Arabia | Proposed | 65 km | Not reported | 1 | 2028 |
| Waqr Khuff-Haradh Gas PipelineWaqr oil and gas field → Haradh Gas Plant | Saudi Arabia | Operating | 50 km | Not reported | 1 | — |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.