Country
Croatia: LNG infrastructure
Croatia has 2 LNG terminals and 24 tracked gas pipelines in the Global Energy Monitor tracker. It is an importer, with 4.49 Mtpa of operating regasification capacity and no operating liquefaction.
Export capacity
—
no export terminal tracked
Import capacity
4.49 Mtpa
operating regasification
Pipelines
24
4,757 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 2 | 4.49 | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Croatia
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Adria LNG TerminalPrimorje-Gorski Kotar | Import | Not reported | Cancelled | Not reported | 1 | — |
| Krk FSRUPrimorje-Gorski Kotar | Import | FSRU | Operating | 4.49 Mtpa | 4 | 2021 |
Gas pipelines crossing Croatia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Bosiljevo–Rjeka Gas PipelineBosiljevo → Rijeka | Croatia | Operating | 81 km | Not reported | 1 | — |
| Bosiljevo–Split Gas PipelineBosiljevo → Pijisevica | Croatia | Operating | 183 km | Not reported | 1 | — |
| Bosiljevo–Split Gas PipelineZadar → Split | Croatia | Operating | 135 km | Not reported | 1 | — |
| Bosnia and Herzegovina–Croatia South Interconnection Gas PipelinePosusje → Novi Travnik | Bosnia And Herzegovina, Croatia | Proposed | 168 km | 1.5 bcm/y | 1 | 2026 |
| Bosnia and Herzegovina–Croatia South Interconnection Gas PipelineZagvozd → Posusje | Bosnia And Herzegovina, Croatia | Proposed | 22 km | 1.5 bcm/y | 1 | 2026 |
| Croatia-Slovenia Interconnector Gas PipelineJezerisce → Rogatec | Croatia | Proposed | 8 km | 5.7 bcm/y | 1 | 2030 |
| Donje Mijolac-Bata Gas PipelineDonje Mijolac → Bata | Hungary, Croatia | Operating | 73 km | Not reported | 1 | — |
| Donje Mijoljac-Oroslavke Gas PipelineDonje Mijoljac → Durdevac | Croatia | Operating | 103 km | Not reported | 1 | — |
| Donje Mijoljac-Oroslavke Gas PipelineDurdevac → Ludbreg | Croatia | Operating | 37 km | Not reported | 1 | — |
| Donje Mijoljac-Oroslavke Gas PipelineLudbreg → Oroslavke | Croatia | Operating | 63 km | Not reported | 1 | — |
| Donji Miholjac–Belišće Gas pipelineDonji Miholjac → Belišće | Croatia | Operating | 20 km | 1.05 bcm/y | 1 | 2020 |
| Ionian Adriatic Gas PipelineFier → Split | Albania, Montenegro, Croatia | Proposed | 540 km | 5 bcm/y | 1 | 2029 |
| Kalce-Kastav Gas PipelineKalce → Kastav | Slovenia, Croatia | Shelved | 63 km | Not reported | 1 | 2024 |
| Kneginec–Varaždin II Gas PipelineGornji Kneginec → Varaždin | Croatia | Operating | 8 km | 0.54 bcm/y | 1 | 2020 |
| Lucko–Bosiljevo Gas PipelineLucko → Bosiljevo | Croatia | Operating | 65 km | Not reported | 1 | — |
| Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineKrk → Zlobin | Croatia | Operating | 18 km | 2.63 bcm/y | 1 | 2021 |
| Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineZlobin → Bosiljevo | Croatia | Operating | 58 km | 1.84 bcm/y | 1 | 2025 |
| Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipelineKozarac → Slobodnica | Croatia | Proposed | 128 km | 3.29 bcm/y | 1 | 2030 |
| Rijeka–Pula Gas PipelineRijeka → Pula | Croatia | Operating | 95 km | Not reported | 1 | — |
| Slobodnica–Lucko Gas PipelineSlobodnica → Lucko | Croatia | Operating | 193 km | Not reported | 1 | — |
| South Stream Gas PipelineAnapa → Tarvisio and Baumgarten an der March | Russia, Bulgaria, Serbia, Hungary, Croatia, Slovakia, Slovenia, Austria, Greece, Italy | Cancelled | 2,380 km | 63 bcm/y | 1 | — |
| Umag-Plovanija-Koper Gas PipelineUmag → Koper | Croatia, Slovenia | Cancelled | 8 km | 0.58 bcm/y | 1 | 2029 |
| Városföld-Slobodnica Gas PipelineVárosföld → Slobodnica | Hungary, Croatia | Operating | 293 km | 7 bcm/y | 1 | 2011 |
| Zadvarje–Brela Gas PipelineZadvarje → Brela | Croatia | Cancelled | 15 km | 0.54 bcm/y | 1 | 2026 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.