Import terminal · Germany
Wilhelmshaven NWO FSRU
Wilhelmshaven NWO FSRU is a cancelled LNG import terminal (floating storage and regasification unit (FSRU)) in Germany. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Nord-West Oelleitung GmbH.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Cancelled | 6.62 | 9 | — | — | Not reported | Nord-West Oelleitung [TO BE DELETED] GmbH [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 6.62 | 9 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Wilhelmshaven NWO FSRU at 53.5167° N, 8.1333° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 53.5167° N, 8.1333° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Wilhelmshaven LNG Terminal Pipeline | Operating | 28 km | 10 bcm/y | 4.5 km | route proximity |
| NETRA Gas Pipeline | Operating | 408 km | 21.4 bcm/y | 11.3 km | route proximity |
| Etzel-Wardenburg-Drohne Gas Pipeline | Under construction | 60 km | — | 12.2 km | route proximity |
| Bunde-Etzel Gas Pipeline | Operating | 60 km | 39.4 bcm/y | 13.2 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Wilhelmshaven NWO FSRU?
- Wilhelmshaven NWO FSRU is an LNG import terminal in Germany. It is made up of 1 tracked train or phase.
- Is Wilhelmshaven NWO FSRU operating?
- Wilhelmshaven NWO FSRU is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Wilhelmshaven NWO FSRU handle?
- Global Energy Monitor reports no capacity for Wilhelmshaven NWO FSRU, so none is shown. That is an absent figure, not a zero.
- Who owns Wilhelmshaven NWO FSRU?
- Wilhelmshaven NWO FSRU is owned by Nord-West Oelleitung GmbH, and operated by Nord-West Oelleitung GmbH. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Wilhelmshaven NWO FSRU pass?
- Cargoes from Wilhelmshaven NWO FSRU would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Wilhelmshaven NWO FSRU?
- 4 tracked gas pipelines pass within 25 km of Wilhelmshaven NWO FSRU. Proximity is not proof of a physical connection; each match is listed with its distance.