Import terminal · Rio Grande do Sul, Brazil
Tergás Rio Grande LNG Terminal
Tergás Rio Grande LNG Terminal is a shelved LNG import terminal in Rio Grande do Sul, Brazil. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Grupo Cobra.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Brazil
- State / province
- Rio Grande do Sul
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Shelved
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 32.1184° S, 52.1062° W
- GEM terminal ID
- T100000130989
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Shelved | 1.61 | 2.19 | — | — | Not reported | Grupo Cobra [TO BE DELETED] [100%] |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Shelved | 1 | 1.61 | 2.19 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Grupo Cobra100%
Location
Tergás Rio Grande LNG Terminal at 32.1184° S, 52.1062° W, with 2 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 32.1184° S, 52.1062° W
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Colpa-Rio Grande Gas Pipeline | Operating | 88 km | 2.5 bcm/y | — | name match |
| Yacuíba-Río Grande Gas Pipeline | Operating | 432 km | 7.3 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Panama Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Tergás Rio Grande LNG Terminal?
- Tergás Rio Grande LNG Terminal is an LNG import terminal in Rio Grande do Sul, Brazil. It is made up of 1 tracked train or phase.
- Is Tergás Rio Grande LNG Terminal operating?
- Tergás Rio Grande LNG Terminal is shelved. Nothing here should be read as a forecast that it will be built.
- How much LNG can Tergás Rio Grande LNG Terminal handle?
- Global Energy Monitor reports no capacity for Tergás Rio Grande LNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Tergás Rio Grande LNG Terminal?
- Tergás Rio Grande LNG Terminal is owned by Grupo Cobra. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Tergás Rio Grande LNG Terminal pass?
- Cargoes from Tergás Rio Grande LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Tergás Rio Grande LNG Terminal?
- 2 tracked gas pipelines pass within 25 km of Tergás Rio Grande LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.