LNG Chain

Import terminal · Wales, United Kingdom

South Hook LNG Terminal

South Hook LNG Terminal is an operating LNG import terminal in Wales, United Kingdom. The tracker lists 2 tracked units with 19.5 Mtpa operating, the earliest starting in 2009. Owners include QatarEnergy, ExxonMobil, TotalEnergies and others.

Operating

19.5 Mtpa

26.5 bcm/y · 2 units

Under construction

no units under construction

Proposed

no units proposed

At a glance

State / province
Wales
Region
Not reported
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Operating
Trains / phases tracked
2
Earliest start year
2009
Latest start year
2025
Coordinates
51.7152° N, 5.0763° W
GEM terminal ID
T100000130557
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedOperating15.621.22009Not reportedQatarEnergy [67.5%]; Exxon Mobil Corp [24.15%]; TotalEnergies SE [8.35%]
Unit ExpansionOperating3.95.32025Not reportedQatarEnergy [67.5%]; Exxon Mobil Corp [24.15%]; TotalEnergies SE [8.35%]

Capacity by status

StatusUnitsMtpabcm/y
Operating219.526.5

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

South Hook LNG Terminal at 51.7152° N, 5.0763° W, with 1 tracked gas pipeline passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
51.7152° N, 5.0763° W
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
National Transmission SystemOperating7,650 km0.5 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

  • Strait of Gibraltar
  • Suez Canal
  • Bab el-Mandeb
  • Danish Straits

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is South Hook LNG Terminal?
South Hook LNG Terminal is an LNG import terminal in Wales, United Kingdom. It is made up of 2 tracked trains and phases.
Is South Hook LNG Terminal operating?
South Hook LNG Terminal is operating, with its first tracked train starting in 2009.
How much LNG can South Hook LNG Terminal handle?
South Hook LNG Terminal has 19.5 Mtpa operating, equivalent to 26.5 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
Who owns South Hook LNG Terminal?
South Hook LNG Terminal is owned by QatarEnergy, ExxonMobil and TotalEnergies, and operated by South Hook LNG Terminal. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from South Hook LNG Terminal pass?
Cargoes from South Hook LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to South Hook LNG Terminal?
1 tracked gas pipeline passes within 25 km of South Hook LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.