Import terminal · South Chungcheong, South Korea
KOGAS Dangjin LNG Terminal
KOGAS Dangjin LNG Terminal is an under construction LNG import terminal in South Chungcheong, South Korea. The tracker lists 2 tracked units with 6 Mtpa under construction, 7.7 Mtpa proposed. It is owned by KOGAS.
Operating
—
no units operating
Under construction
6 Mtpa
8.16 bcm/y · 1 unit
Proposed
7.7 Mtpa
10.5 bcm/y · 1 unit
At a glance
- Country
- South Korea
- State / province
- South Chungcheong
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Under construction
- Trains / phases tracked
- 2
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 37.0086° N, 126.6061° E
- GEM terminal ID
- T100000130612
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Under construction | 6 | 8.16 | — | — | Not reported | Korea Gas Corp [100%] |
| Unit Phase 2 | Proposed | 7.7 | 10.5 | — | — | Not reported | Korea Gas Corp [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Under construction | 1 | 6 | 8.16 |
| Proposed | 1 | 7.7 | 10.5 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- KOGAS100%
Location
KOGAS Dangjin LNG Terminal at 37.0086° N, 126.6061° E.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 37.0086° N, 126.6061° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
No tracked gas pipeline passes within 25 km of this terminal in the current release.
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Malacca
- Strait of Hormuz
- Panama Canal
- Lombok Strait
- Taiwan Strait
Cargoes reach north-east Asia from the Middle East, Australia, the United States and Russia, so exposure is spread.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is KOGAS Dangjin LNG Terminal?
- KOGAS Dangjin LNG Terminal is an LNG import terminal in South Chungcheong, South Korea. It is made up of 2 tracked trains and phases.
- Is KOGAS Dangjin LNG Terminal operating?
- KOGAS Dangjin LNG Terminal is under construction. Nothing here should be read as a forecast that it will be built.
- How much LNG can KOGAS Dangjin LNG Terminal handle?
- KOGAS Dangjin LNG Terminal has 6 Mtpa under construction, 7.7 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns KOGAS Dangjin LNG Terminal?
- KOGAS Dangjin LNG Terminal is owned by KOGAS. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from KOGAS Dangjin LNG Terminal pass?
- Cargoes from KOGAS Dangjin LNG Terminal would normally pass Strait of Malacca, Strait of Hormuz, Panama Canal, Lombok Strait and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.