Import terminal · Guangdong, China
Hongmei LNG Terminal
Hongmei LNG Terminal is an operating LNG import terminal in Guangdong, China. The tracker lists 1 tracked unit with 1.5 Mtpa operating, the earliest starting in 2012. It is owned by JOVO LNG Storage and Transportation Co.,ltd.dongguan.
Operating
1.5 Mtpa
2.04 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Operating | 1.5 | 2.04 | 2012 | — | Not reported | JOVO LNG Storage and Transportation Co.,ltd.dongguan [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 1 | 1.5 | 2.04 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Hongmei LNG Terminal at 22.9536° N, 113.5566° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 22.9536° N, 113.5566° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Guangdong Pearl River Delta gas pipeline network | Operating | 444 km | 9.5 bcm/y | 3.8 km | route proximity |
| Guangdong Pearl River Delta gas pipeline network | Operating | 23 km | 4.46 bcm/y | 13.2 km | route proximity |
| West-East Gas Pipeline 2 | Operating | 9,102 km | 30 bcm/y | 21.7 km | route proximity |
| Guangdong Gas Pipeline Network | Operating | 16 km | 5 bcm/y | 24.4 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Malacca
- Strait of Hormuz
- Panama Canal
- Lombok Strait
- Taiwan Strait
Cargoes reach north-east Asia from the Middle East, Australia, the United States and Russia, so exposure is spread.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Hongmei LNG Terminal?
- Hongmei LNG Terminal is an LNG import terminal in Guangdong, China. It is made up of 1 tracked train or phase.
- Is Hongmei LNG Terminal operating?
- Hongmei LNG Terminal is operating, with its first tracked train starting in 2012.
- How much LNG can Hongmei LNG Terminal handle?
- Hongmei LNG Terminal has 1.5 Mtpa operating, equivalent to 2.04 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Hongmei LNG Terminal?
- Hongmei LNG Terminal is owned by JOVO LNG Storage and Transportation Co.,ltd.dongguan. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Hongmei LNG Terminal pass?
- Cargoes from Hongmei LNG Terminal would normally pass Strait of Malacca, Strait of Hormuz, Panama Canal, Lombok Strait and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Hongmei LNG Terminal?
- 4 tracked gas pipelines pass within 25 km of Hongmei LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.