LNG Chain

Export terminal · Nova Scotia, Canada

Goldboro LNG Terminal

Goldboro LNG Terminal is a cancelled LNG export terminal in Nova Scotia, Canada. The tracker lists 2 tracked units; capacity is not reported. It is owned by Cavvy Energy Ltd.

Operating

no units operating

Under construction

no units under construction

Proposed

no units proposed

At a glance

Country
Canada
State / province
Nova Scotia
Region
Not reported
Import / export
Export
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
2
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
45.1658° N, 61.6287° W
GEM terminal ID
T100000130354
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit T1CancelledNot reportedNot reportedNot reportedCavvy Energy Ltd [100%]
Unit T2CancelledNot reportedNot reportedNot reportedCavvy Energy Ltd [100%]

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Goldboro LNG Terminal at 45.1658° N, 61.6287° W, with 2 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
45.1658° N, 61.6287° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Bear Paw Gas PipelineCancelled63 km1.7 kmroute proximity
Maritimes and Northeast Gas PipelineOperating1,432 km8.48 bcm/y1.8 kmroute proximity

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Goldboro LNG Terminal?
Goldboro LNG Terminal is an LNG export terminal in Nova Scotia, Canada. It is made up of 2 tracked trains and phases.
Is Goldboro LNG Terminal operating?
Goldboro LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
How much LNG can Goldboro LNG Terminal handle?
Global Energy Monitor reports no capacity for Goldboro LNG Terminal, so none is shown. That is an absent figure, not a zero.
Who owns Goldboro LNG Terminal?
Goldboro LNG Terminal is owned by Cavvy Energy Ltd. Shares are as recorded in the current tracker release.
What pipelines connect to Goldboro LNG Terminal?
2 tracked gas pipelines pass within 25 km of Goldboro LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.