Import terminal · Apulia, Italy
Gioia Tauro LNG Terminal
Gioia Tauro LNG Terminal is a proposed LNG import terminal in Apulia, Italy. The tracker lists 1 tracked unit with 8.82 Mtpa proposed. It is owned by LNG Medgas Terminal SRL.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
8.82 Mtpa
12 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Proposed | 8.82 | 12 | — | — | Not reported | LNG Medgas Terminal SRL |
Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 1 | 8.82 | 12 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Location
Gioia Tauro LNG Terminal at 38.4247° N, 15.8994° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 38.4247° N, 15.8994° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Palmi–Messina Gas Pipeline | Operating | 32 km | — | 2.4 km | route proximity |
| MaidaSEufemia–Reggio Calabria Gas Pipeline | Operating | 96 km | — | 6.1 km | route proximity |
| Reggio Calabria–Messina Gas Pipeline | Operating | 19 km | — | 19.2 km | route proximity |
| Trans-Mediterranean Gas Pipeline | Operating | 355 km | — | 22.6 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Gioia Tauro LNG Terminal?
- Gioia Tauro LNG Terminal is an LNG import terminal in Apulia, Italy. It is made up of 1 tracked train or phase.
- Is Gioia Tauro LNG Terminal operating?
- Gioia Tauro LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
- How much LNG can Gioia Tauro LNG Terminal handle?
- Gioia Tauro LNG Terminal has 8.82 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Gioia Tauro LNG Terminal?
- Gioia Tauro LNG Terminal is owned by LNG Medgas Terminal SRL. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Gioia Tauro LNG Terminal pass?
- Cargoes from Gioia Tauro LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Gioia Tauro LNG Terminal?
- 4 tracked gas pipelines pass within 25 km of Gioia Tauro LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.