Export terminal · Northern Territory, Australia
Darwin LNG Terminal
Darwin LNG Terminal is a proposed LNG export terminal in Northern Territory, Australia. The tracker lists 2 tracked units with 6 Mtpa proposed, the earliest starting in 2006. Owners include Santos Ltd, SK E&S Co Ltd, INPEX DLNGPL Pty Ltd and 3 others.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
6 Mtpa
8.16 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1 | Idle | 3.7 | 5.03 | 2006 | — | Not reported | Santos Ltd [43.4%]; SK E&S Co Ltd [25%]; INPEX DLNGPL Pty Ltd [11.4%]; Eni Australia BV [11%]; JERA Co Inc [6.1%]; Tokyo Gas Co Ltd [3.1%] |
| Unit T2 | Proposed | 6 | 8.16 | — | — | Not reported | Santos Ltd [43.4%]; SK E&S Co Ltd [25%]; INPEX DLNGPL Pty Ltd [11.4%]; Eni Australia BV [11%]; JERA Co Inc [6.1%]; Tokyo Gas Co Ltd [3.1%] |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Santos Ltd43.4%
- SK E&S Co Ltd25%
- INPEX DLNGPL Pty Ltd11.4%
- Eni Australia BV11%
- JERA6.1%
- Tokyo Gas Co Ltd3.1%
Operators
Location
Darwin LNG Terminal at 12.5210° S, 130.8664° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 12.5210° S, 130.8664° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Barossa Export Pipeline | Operating | 122 km | 8.69 bcm/y | 0.6 km | route proximity |
| Bayu-Undan to Darwin Pipeline | Idle | 502 km | 4.75 bcm/y | 0.6 km | route proximity |
| Amadeus Gas Pipeline | Operating | 1,658 km | 1.66 bcm/y | 4.1 km | route proximity |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Lombok StraitMakassar StraitLarger vessels favour Lombok over the shallower Malacca route. | Strait of Malacca |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Darwin LNG Terminal?
- Darwin LNG Terminal is an LNG export terminal in Northern Territory, Australia. It is made up of 2 tracked trains and phases.
- Is Darwin LNG Terminal operating?
- Darwin LNG Terminal is proposed, with a first tracked start year of 2006. Nothing here should be read as a forecast that it will be built.
- How much LNG can Darwin LNG Terminal handle?
- Darwin LNG Terminal has 6 Mtpa proposed. Capacity at different statuses is never added together.
- Who owns Darwin LNG Terminal?
- Darwin LNG Terminal is owned by Santos Ltd, SK E&S Co Ltd, INPEX DLNGPL Pty Ltd and 3 others, and operated by Santos Ltd. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Darwin LNG Terminal pass?
- Cargoes from Darwin LNG Terminal would normally pass Lombok Strait, Makassar Strait and Strait of Malacca. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Darwin LNG Terminal?
- 3 tracked gas pipelines pass within 25 km of Darwin LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.