Export terminal · Texas, United States
Corpus Christi LNG Terminal
Corpus Christi LNG Terminal is an operating LNG export terminal in Texas, United States. The tracker lists 6 tracked units with 15 Mtpa operating, 15.4 Mtpa under construction, 24 Mtpa proposed, the earliest starting in 2018. Ownership is not reported.
Operating
15 Mtpa
20.4 bcm/y · 3 units
Under construction
15.4 Mtpa
20.9 bcm/y · 2 units
Proposed
24 Mtpa
32.6 bcm/y · 1 unit
At a glance
- Country
- United States
- State / province
- Texas
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Operating
- Trains / phases tracked
- 6
- Earliest start year
- 2018
- Latest start year
- 2021
- Coordinates
- 27.9135° N, 97.2866° W
- GEM terminal ID
- T100000130216
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Stage 1 T01 | Operating | 5 | 6.8 | 2018 | — | Not reported | Not reported |
| Unit Stage 1 T02 | Operating | 5 | 6.8 | 2019 | — | Not reported | Not reported |
| Unit Stage 2 T03 | Operating | 5 | 6.8 | 2021 | — | Not reported | Not reported |
| Unit Stage 3 (T04-T10) | Under construction | 10.4 | 14.1 | — | — | Not reported | Not reported |
| Unit Stage 3 (T11-T12) Expansion & Debottlenecking | Under construction | 5 | 6.8 | — | — | Not reported | Not reported |
| Unit Stage 4 (T13-16) Expansion | Proposed | 24 | 32.6 | — | — | Not reported | Not reported |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 3 | 15 | 20.4 |
| Under construction | 2 | 15.4 | 20.9 |
| Proposed | 1 | 24 | 32.6 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Ownership is not reported for this terminal.
Location
Corpus Christi LNG Terminal at 27.9135° N, 97.2866° W, with 6 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 27.9135° N, 97.2866° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Corpus Christi Pipeline | Operating | 34 km | 15.64 bcm/y | 0.6 km | route proximity |
| Corpus Christi Pipeline | Operating | 37 km | 23 bcm/y | 1.2 km | route proximity |
| Houston Gas Pipeline (HPL) System | Operating | 6,116 km | 54.17 bcm/y | 2.3 km | route proximity |
| Florida Gas Transmission Pipeline | Operating | 8,530 km | 10.83 bcm/y | 2.8 km | route proximity |
| Texas Eastern Transmission (TETCO) Gas Pipeline | Operating | 14,202 km | 119.47 bcm/y | 5.2 km | route proximity |
| Tennessee Gas Pipeline | Operating | 18,926 km | 10.22 bcm/y | 5.8 km | route proximity |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| East Asia | Panama CanalPanama slot availability and draught decide between these; the Cape is the fallback. | Suez CanalStrait of Malacca |
| South Asia | Suez CanalBab el-Mandeb | Cape of Good Hope |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.