Gas transmission pipeline · Zhejiang LNG Terminal, Beilun District to Xinchang Distribution Station, Xinchang County
Zhejiang Natural Gas Pipeline Network
Zhejiang Natural Gas Pipeline Network is an under construction gas transmission pipeline in China. The tracker lists 1 tracked segment, 153 km long and 3.5 bcm/y of capacity. It runs from Zhejiang LNG Terminal, Beilun District to Xinchang Distribution Station, Xinchang County. It is owned by National Pipeline Network Group Zhejiang Natural Gas Pipeline Network Co Ltd.
Length
153 km
Capacity
3.5 bcm/y
2.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Zhejiang Natural Gas Pipeline Network runs from Zhejiang LNG Terminal, Beilun District to Xinchang Distribution Station, Xinchang County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Zhejiang LNG Terminal, Beilun District
- To
- Xinchang Distribution Station, Xinchang County
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 202 km
- GEM pipeline ID
- P4842
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Yongshao Gas Pipeline East Section (Zhongzhai-Xinchang) | Under construction | Zhejiang LNG Terminal, Beilun District → Xinchang Distribution Station, Xinchang County | 153 | 3.5 | 1219 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Zhejiang Ningbo LNG Terminal | China | Import | Operating | 0 km | route proximity |
| Chuanbi Island LNG Terminal | China | Import | Cancelled | 7 km | route proximity |
| Liuheng LNG Terminal (Zhejiang Energy) | China | Import | Under construction | 14.8 km | route proximity |
| Liuheng LNG Terminal (Sinopec) | China | Import | Under construction | 15.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.