LNG Chain

Gas transmission pipeline · Zhanaozen to Zhetybay

Zhanaozen-Zhetybay-Aktau Gas Pipeline

Zhanaozen-Zhetybay-Aktau Gas Pipeline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 61 km long and 4.54 bcm/y of capacity, starting up in 2008. It runs from Zhanaozen to Zhetybay. It is owned by QazaqGaz.

Length

61 km

Capacity

4.54 bcm/y

3.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 530 mm (21 in)

Route

Zhanaozen-Zhetybay-Aktau Gas Pipeline runs from Zhanaozen to Zhetybay. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Zhanaozen
To
Zhetybay
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
58 km
GEM pipeline ID
P5777
Start year
2008
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Zhanaozen-ZhetybayOperatingZhanaozen → Zhetybay614.54530 mm2008GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Zhanaozen-Zhetybay-Aktau Gas Pipeline run?
Zhanaozen-Zhetybay-Aktau Gas Pipeline runs from Zhanaozen to Zhetybay, crossing Kazakhstan.
How long is Zhanaozen-Zhetybay-Aktau Gas Pipeline?
Zhanaozen-Zhetybay-Aktau Gas Pipeline is 61 km long.
How much gas can Zhanaozen-Zhetybay-Aktau Gas Pipeline carry?
Zhanaozen-Zhetybay-Aktau Gas Pipeline has a design capacity of 4.54 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Zhanaozen-Zhetybay-Aktau Gas Pipeline operating?
Zhanaozen-Zhetybay-Aktau Gas Pipeline is operating, having started in 2008.
Who owns Zhanaozen-Zhetybay-Aktau Gas Pipeline?
Zhanaozen-Zhetybay-Aktau Gas Pipeline is owned by QazaqGaz, as recorded in the current tracker release.