Gas transmission pipeline · Yelets to Kryvyi Rih
Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline
Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline is an operating gas transmission pipeline crossing Russia, Ukraine. The tracker lists 1 tracked segment, 771 km long and 34.68 bcm/y of capacity, starting up in 1986. It runs from Yelets to Kryvyi Rih. It is owned by Gazprom PJSC and Gas Transmission System Operator of Ukraine.
Length
771 km
Capacity
34.7 bcm/y
25.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1420 mm (56 in)
Route
Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline runs from Yelets to Kryvyi Rih. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Yelets
- To
- Kryvyi Rih
- Start country
- Russia
- End country
- Ukraine
- Countries crossed
- Russia, Ukraine
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 660 km
- GEM pipeline ID
- P0783
- Start year
- 1986
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Yelets → Kryvyi Rih | 771 | 34.7 | 1420 mm | 1986 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline run?
- Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline runs from Yelets to Kryvyi Rih, crossing Russia and Ukraine.
- How long is Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline?
- Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline is 771 km long.
- How much gas can Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline carry?
- Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline has a design capacity of 34.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline operating?
- Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline is operating, having started in 1986.
- Who owns Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline?
- Yelets-Kremenchuk–Kryvyi Rih Gas Pipeline is owned by Gas Transmission System Operator of Ukraine and Gazprom PJSC, as recorded in the current tracker release.