Gas transmission pipeline · Torzhok to Frankfurt an der Oder

Yamal-Europe Gas Pipeline

Yamal-Europe Gas Pipeline is an idle gas transmission pipeline crossing Russia, Belarus, Germany and 1 more. The tracker lists 1 tracked segment, 1,660 km long and 33 bcm/y of capacity, starting up in 1999. It runs from Torzhok to Frankfurt an der Oder. It is owned by EuRoPol Gaz, GASCADE Gastransport GmbH and Gazprom PJSC.

Length

1,660 km

Capacity

33 bcm/y

24.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1420 mm (56 in)

Route

Yamal-Europe Gas Pipeline runs from Torzhok to Frankfurt an der Oder. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Torzhok
To
Frankfurt an der Oder
Start country
Russia
End country
Germany
Countries crossed
Russia, Belarus, Germany, Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
1,541 km
GEM pipeline ID
P0769
Start year
1999
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineIdleTorzhok → Frankfurt an der Oder1,660331420 mm1999GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Yamal-Europe Gas Pipeline run?
Yamal-Europe Gas Pipeline runs from Torzhok to Frankfurt an der Oder, crossing Russia, Belarus, Germany and Poland.
How long is Yamal-Europe Gas Pipeline?
Yamal-Europe Gas Pipeline is 1,660 km long.
How much gas can Yamal-Europe Gas Pipeline carry?
Yamal-Europe Gas Pipeline has a design capacity of 33 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Yamal-Europe Gas Pipeline operating?
Yamal-Europe Gas Pipeline is idle, with a reported start year of 1999.
Who owns Yamal-Europe Gas Pipeline?
Yamal-Europe Gas Pipeline is owned by EuRoPol Gaz, GASCADE Gastransport GmbH and Gazprom PJSC, as recorded in the current tracker release.