Gas transmission pipeline · Taixing Town to Furong Town
West-East Gas Pipeline 2
West-East Gas Pipeline 2 is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 58 km long and 6 bcm/y of capacity, starting up in 2014. It runs from Taixing Town to Furong Town. It is owned by West to East Gas Transmission Branch of National Petroleum Pipeline Network Group Co Ltd.
Length
58 km
Capacity
6 bcm/y
4.4 Mtpa LNG equivalent
Segments tracked
1
Route
West-East Gas Pipeline 2 runs from Taixing Town to Furong Town. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Taixing Town
- To
- Furong Town
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 44 km
- GEM pipeline ID
- P4938
- Start year
- 2014
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Taixing-Furong Gas Pipeline | Operating | Taixing Town → Furong Town | 58 | 6 | — | 2014 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Jiangyin LNG Terminal (Hanas) | China | Import | Cancelled | 4.1 km | route proximity |
| Jiangyin LNG Terminal (Garson Gas) | China | Import | Under construction | 5 km | route proximity |
| Jiangyin LNG Terminal (Zhongtian Energy) | China | Import | Shelved | 5.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does West-East Gas Pipeline 2 run?
- West-East Gas Pipeline 2 runs from Taixing Town to Furong Town, crossing China.
- How long is West-East Gas Pipeline 2?
- West-East Gas Pipeline 2 is 58 km long.
- How much gas can West-East Gas Pipeline 2 carry?
- West-East Gas Pipeline 2 has a design capacity of 6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is West-East Gas Pipeline 2 operating?
- West-East Gas Pipeline 2 is operating, having started in 2014.
- Who owns West-East Gas Pipeline 2?
- West-East Gas Pipeline 2 is owned by West to East Gas Transmission Branch of National Petroleum Pipeline Network Group Co Ltd, as recorded in the current tracker release.
- Does West-East Gas Pipeline 2 serve an LNG terminal?
- West-East Gas Pipeline 2 passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.