LNG Chain

Gas transmission pipeline · Berezhki to Medvezhyegorsk

Volkhov-Segezha-Kostomuksha Gas Pipeline

Volkhov-Segezha-Kostomuksha Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 239 km long and 40 bcm/y of capacity. It runs from Berezhki to Medvezhyegorsk. It is owned by Gazprom PJSC.

Length

239 km

Capacity

40 bcm/y

29.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1400 mm (55 in)

Route

Volkhov-Segezha-Kostomuksha Gas Pipeline runs from Berezhki to Medvezhyegorsk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Berezhki
To
Medvezhyegorsk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
369 km
GEM pipeline ID
P4094
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Stage I: Volkhov-Medvezhyegorsk Gas PipelineProposedBerezhki → Medvezhyegorsk239401400 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Volkhov-Segezha-Kostomuksha Gas Pipeline run?
Volkhov-Segezha-Kostomuksha Gas Pipeline runs from Berezhki to Medvezhyegorsk, crossing Russia.
How long is Volkhov-Segezha-Kostomuksha Gas Pipeline?
Volkhov-Segezha-Kostomuksha Gas Pipeline is 239 km long.
How much gas can Volkhov-Segezha-Kostomuksha Gas Pipeline carry?
Volkhov-Segezha-Kostomuksha Gas Pipeline has a design capacity of 40 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Volkhov-Segezha-Kostomuksha Gas Pipeline operating?
Volkhov-Segezha-Kostomuksha Gas Pipeline is proposed.
Who owns Volkhov-Segezha-Kostomuksha Gas Pipeline?
Volkhov-Segezha-Kostomuksha Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.