Vodice-Jarše-Novo mesto pipeline

Vodice-Jarše-Novo mesto pipeline is a proposed gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 66 km long, starting up in 2027. It runs from Vodice to Novo mesto. It is owned by Plinovodi doo.

Length

66 km

Capacity

Not reported

Segments tracked

1

Largest diameter 400 mm (16 in)

Route

Vodice-Jarše-Novo mesto pipeline runs from Vodice to Novo mesto. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Vodice
To
Novo mesto
Start country
Slovenia
End country
Slovenia
Countries crossed
Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
77 km
GEM pipeline ID
P2467
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedVodice → Novo mesto66Not reported400 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Vodice-Jarše-Novo mesto pipeline run?
Vodice-Jarše-Novo mesto pipeline runs from Vodice to Novo mesto, crossing Slovenia.
How long is Vodice-Jarše-Novo mesto pipeline?
Vodice-Jarše-Novo mesto pipeline is 66 km long.
How much gas can Vodice-Jarše-Novo mesto pipeline carry?
No design capacity is reported for Vodice-Jarše-Novo mesto pipeline. That is an absent figure, not a zero.
Is Vodice-Jarše-Novo mesto pipeline operating?
Vodice-Jarše-Novo mesto pipeline is proposed, with a reported start year of 2027.
Who owns Vodice-Jarše-Novo mesto pipeline?
Vodice-Jarše-Novo mesto pipeline is owned by Plinovodi doo, as recorded in the current tracker release.