Gas transmission pipeline · Mexico
Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline
Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 390 km long and 10.38 bcm/y of capacity, starting up in 2020. It is owned by Esentia Energy Systems.
Length
390 km
Capacity
10.4 bcm/y
7.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline runs from Mexico. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 361 km
- GEM pipeline ID
- P0435
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 390 | 10.4 | 508 mm | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline run?
- Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline is recorded in Mexico. Global Energy Monitor reports no start and end points for it.
- How long is Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline?
- Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline is 390 km long.
- How much gas can Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline carry?
- Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline has a design capacity of 10.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline operating?
- Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline is operating, having started in 2020.
- Who owns Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline?
- Villa de Reyes-Aguascalientes-Guadalajara Gas Pipeline is owned by Esentia Energy Systems, as recorded in the current tracker release.