Gas transmission pipeline · Agua Dulce to Gulf of Mexico
Valley Crossing Pipeline
Valley Crossing Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 275 km long and 26.57 bcm/y of capacity, starting up in 2019. It runs from Agua Dulce to Gulf of Mexico. It is owned by Enbridge Inc.
Length
275 km
Capacity
26.6 bcm/y
19.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Valley Crossing Pipeline runs from Agua Dulce to Gulf of Mexico. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Agua Dulce
- To
- Gulf of Mexico
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 263 km
- GEM pipeline ID
- P0276
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Agua Dulce → Gulf of Mexico | 275 | 26.6 | 1067 mm | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Rio Grande LNG Terminal | United States | Export | Under construction | 1.1 km | route proximity |
| Texas LNG Terminal | United States | Export | Proposed | 1.6 km | route proximity |
| Jupiter Offshore Loading Terminal (JOLT) | United States | Export | Cancelled | 1.7 km | route proximity |
| Annova LNG Terminal | United States | Export | Cancelled | 5.4 km | route proximity |
| Barca LNG Terminal | United States | Export | Cancelled | 5.4 km | route proximity |
| Eos FLNG Terminal | United States | Export | Cancelled | 5.4 km | route proximity |
| Bay Crossing LNG Terminal | United States | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Enbridge Inc100%
Parent companies
- Enbridge Inc100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Valley Crossing Pipeline run?
- Valley Crossing Pipeline runs from Agua Dulce to Gulf of Mexico, crossing United States.
- How long is Valley Crossing Pipeline?
- Valley Crossing Pipeline is 275 km long.
- How much gas can Valley Crossing Pipeline carry?
- Valley Crossing Pipeline has a design capacity of 26.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Valley Crossing Pipeline operating?
- Valley Crossing Pipeline is operating, having started in 2019.
- Who owns Valley Crossing Pipeline?
- Valley Crossing Pipeline is owned by Enbridge Inc, as recorded in the current tracker release.
- Does Valley Crossing Pipeline serve an LNG terminal?
- Valley Crossing Pipeline passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.