Gas transmission pipeline · Aranda to Valladolid
Valladolid–Aranda Gas Pipeline
Valladolid–Aranda Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 87 km long, starting up in 1990. It runs from Aranda to Valladolid. It is owned by Enagás SA.
Length
87 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Valladolid–Aranda Gas Pipeline runs from Aranda to Valladolid. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Aranda
- To
- Valladolid
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 87 km
- GEM pipeline ID
- P3067
- Start year
- 1990
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Aranda → Valladolid | 87 | Not reported | 508 mm | 1990 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Valladolid–Aranda Gas Pipeline run?
- Valladolid–Aranda Gas Pipeline runs from Aranda to Valladolid, crossing Spain.
- How long is Valladolid–Aranda Gas Pipeline?
- Valladolid–Aranda Gas Pipeline is 87 km long.
- How much gas can Valladolid–Aranda Gas Pipeline carry?
- No design capacity is reported for Valladolid–Aranda Gas Pipeline. That is an absent figure, not a zero.
- Is Valladolid–Aranda Gas Pipeline operating?
- Valladolid–Aranda Gas Pipeline is operating, having started in 1990.
- Who owns Valladolid–Aranda Gas Pipeline?
- Valladolid–Aranda Gas Pipeline is owned by Enagás SA, as recorded in the current tracker release.