Gas transmission pipeline · Ligurian Sea to Cairo Montenotte
Upper Tyrrhenian Sea Gas Pipeline
Upper Tyrrhenian Sea Gas Pipeline is a proposed gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 35 km long, starting up in 2026. It runs from Ligurian Sea to Cairo Montenotte.
Length
35 km
Capacity
Not reported
Segments tracked
1
Largest diameter 500 mm (20 in)
Route
Upper Tyrrhenian Sea Gas Pipeline runs from Ligurian Sea to Cairo Montenotte. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ligurian Sea
- To
- Cairo Montenotte
- Start country
- Italy
- End country
- Italy
- Countries crossed
- Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 37 km
- GEM pipeline ID
- P7703
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Ligurian Sea → Cairo Montenotte | 35 | Not reported | 500 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Upper Tyrrhenian Sea Gas Pipeline run?
- Upper Tyrrhenian Sea Gas Pipeline runs from Ligurian Sea to Cairo Montenotte, crossing Italy.
- How long is Upper Tyrrhenian Sea Gas Pipeline?
- Upper Tyrrhenian Sea Gas Pipeline is 35 km long.
- How much gas can Upper Tyrrhenian Sea Gas Pipeline carry?
- No design capacity is reported for Upper Tyrrhenian Sea Gas Pipeline. That is an absent figure, not a zero.
- Is Upper Tyrrhenian Sea Gas Pipeline operating?
- Upper Tyrrhenian Sea Gas Pipeline is proposed, with a reported start year of 2026.
- Who owns Upper Tyrrhenian Sea Gas Pipeline?
- Ownership of Upper Tyrrhenian Sea Gas Pipeline is not reported in the current tracker release.