Gas transmission pipeline · Katy to Port Arthur
Trident Gas Pipeline
Trident Gas Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 348 km long and 15.33 bcm/y of capacity, starting up in 2027. It runs from Katy to Port Arthur. It is owned by Kinder Morgan Inc.
Length
348 km
Capacity
15.3 bcm/y
11.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Trident Gas Pipeline runs from Katy to Port Arthur. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Katy
- To
- Port Arthur
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 347 km
- GEM pipeline ID
- P7779
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Katy → Port Arthur | 348 | 15.3 | 1067 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Golden Pass LNG Terminal | United States | Export | Operating | 1.5 km | route proximity |
| Port Arthur LNG Terminal | United States | Export | Under construction | 1.5 km | route proximity |
| Sabine Pass LNG Terminal | United States | Export | Operating | 5.9 km | route proximity |
| Alturas LNG Terminal | United States | Export | Cancelled | 8 km | route proximity |
| Phillips 66 Beamont Oil Terminal | United States | Export | Operating | 16.4 km | route proximity |
| Beacon Port LNG Terminal | United States | Import | Cancelled | 22.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Trident Gas Pipeline run?
- Trident Gas Pipeline runs from Katy to Port Arthur, crossing United States.
- How long is Trident Gas Pipeline?
- Trident Gas Pipeline is 348 km long.
- How much gas can Trident Gas Pipeline carry?
- Trident Gas Pipeline has a design capacity of 15.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Trident Gas Pipeline operating?
- Trident Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Trident Gas Pipeline?
- Trident Gas Pipeline is owned by Kinder Morgan Inc, as recorded in the current tracker release.
- Does Trident Gas Pipeline serve an LNG terminal?
- Trident Gas Pipeline passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.