LNG Chain

Gas transmission pipeline · Agua Dulce to Katy

Traverse Gas Pipeline

Traverse Gas Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 258 km long and 17.89 bcm/y of capacity, starting up in 2027. It runs from Agua Dulce to Katy. It is owned by Blackcomb Pipeline JV.

Length

258 km

Capacity

17.9 bcm/y

13.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Traverse Gas Pipeline runs from Agua Dulce to Katy. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Agua Dulce
To
Katy
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
234 km
GEM pipeline ID
P7796
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedAgua Dulce → Katy25817.9914 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Calhoun LNG TerminalUnited StatesImportCancelled16.1 kmroute proximity
Port Lavaca FLNG TerminalUnited StatesExportCancelled16.1 kmroute proximity
Point Comfort LNG TerminalUnited StatesExportCancelled17.6 kmroute proximity
Coastal Bend LNG TerminalUnited StatesExportProposed22.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.