Gas transmission pipeline · Agua Dulce to Katy
Traverse Gas Pipeline
Traverse Gas Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 258 km long and 17.89 bcm/y of capacity, starting up in 2027. It runs from Agua Dulce to Katy. It is owned by Blackcomb Pipeline JV.
Length
258 km
Capacity
17.9 bcm/y
13.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Traverse Gas Pipeline runs from Agua Dulce to Katy. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Agua Dulce
- To
- Katy
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 234 km
- GEM pipeline ID
- P7796
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Agua Dulce → Katy | 258 | 17.9 | 914 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Calhoun LNG Terminal | United States | Import | Cancelled | 16.1 km | route proximity |
| Port Lavaca FLNG Terminal | United States | Export | Cancelled | 16.1 km | route proximity |
| Point Comfort LNG Terminal | United States | Export | Cancelled | 17.6 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | 22.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.