Gas transmission pipeline · Texas to Arizona
Transwestern Gas Pipeline
Transwestern Gas Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 830 km long and 15.33 bcm/y of capacity, starting up in 2029. It runs from Texas to Arizona. It is owned by Energy Transfer Partners.
Length
830 km
Capacity
15.3 bcm/y
11.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Transwestern Gas Pipeline runs from Texas to Arizona. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Texas
- To
- Arizona
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 812 km
- GEM pipeline ID
- P7840
- Start year
- 2029
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Desert Southwest Expansion | Proposed | Texas → Arizona | 830 | 15.3 | 1067 mm | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Transwestern Gas Pipeline run?
- Transwestern Gas Pipeline runs from Texas to Arizona, crossing United States.
- How long is Transwestern Gas Pipeline?
- Transwestern Gas Pipeline is 830 km long.
- How much gas can Transwestern Gas Pipeline carry?
- Transwestern Gas Pipeline has a design capacity of 15.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Transwestern Gas Pipeline operating?
- Transwestern Gas Pipeline is proposed, with a reported start year of 2029.
- Who owns Transwestern Gas Pipeline?
- Transwestern Gas Pipeline is owned by Energy Transfer Partners, as recorded in the current tracker release.