Gas transmission pipeline · Schwarzach to Tannenkirch
Trans Europa Naturgas Pipeline
Trans Europa Naturgas Pipeline is an operating gas transmission pipeline in Germany. The tracker lists 1 tracked segment, 29 km long, starting up in 2025. It runs from Schwarzach to Tannenkirch.
Length
29 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1000 mm (39 in)
Route
Trans Europa Naturgas Pipeline runs from Schwarzach to Tannenkirch. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Schwarzach
- To
- Tannenkirch
- Start country
- Germany
- End country
- Germany
- Countries crossed
- Germany
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 30 km
- GEM pipeline ID
- P6871
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Schwarzach–Eckartsweier | Operating | Schwarzach → Tannenkirch | 29 | Not reported | 1000 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Punta Europa LNG Terminal | Equatorial Guinea | Export | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Trans Europa Naturgas Pipeline run?
- Trans Europa Naturgas Pipeline runs from Schwarzach to Tannenkirch, crossing Germany.
- How long is Trans Europa Naturgas Pipeline?
- Trans Europa Naturgas Pipeline is 29 km long.
- How much gas can Trans Europa Naturgas Pipeline carry?
- No design capacity is reported for Trans Europa Naturgas Pipeline. That is an absent figure, not a zero.
- Is Trans Europa Naturgas Pipeline operating?
- Trans Europa Naturgas Pipeline is operating, having started in 2025.
- Who owns Trans Europa Naturgas Pipeline?
- Ownership of Trans Europa Naturgas Pipeline is not reported in the current tracker release.
- Does Trans Europa Naturgas Pipeline serve an LNG terminal?
- Trans Europa Naturgas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.