LNG Chain

Gas transmission pipeline · Torzhok to Dolyna

Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline

Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline is an operating gas transmission pipeline crossing Russia, Belarus, Ukraine. The tracker lists 1 tracked segment, 1,300 km long and 22 bcm/y of capacity, starting up in 1996. It runs from Torzhok to Dolyna. It is owned by Gas Transmission System Operator of Ukraine and Gazprom PJSC.

Length

1,300 km

Capacity

22 bcm/y

16.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1420 mm (56 in)

Route

Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline runs from Torzhok to Dolyna. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Torzhok
To
Dolyna
Start country
Russia
End country
Ukraine
Countries crossed
Russia, Belarus, Ukraine
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
1,267 km
GEM pipeline ID
P0779
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingTorzhok → Dolyna1,300221420 mm1996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline run?
Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline runs from Torzhok to Dolyna, crossing Russia, Belarus and Ukraine.
How long is Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline?
Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline is 1,300 km long.
How much gas can Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline carry?
Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline has a design capacity of 22 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline operating?
Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline is operating, having started in 1996.
Who owns Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline?
Torzhok-Smolensk-Mazyr-Dolyna Gas Pipeline is owned by Gas Transmission System Operator of Ukraine and Gazprom PJSC, as recorded in the current tracker release.