Gas transmission pipeline · Torzhok to Ivatsevichy
Torzhok-Minsk-Ivatsevichy Gas Pipeline
Torzhok-Minsk-Ivatsevichy Gas Pipeline is an operating gas transmission pipeline crossing Russia, Belarus. The tracker lists 1 tracked segment, 851 km long and 40 bcm/y of capacity, starting up in 1974. It runs from Torzhok to Ivatsevichy. It is owned by Gazprom PJSC.
Length
851 km
Capacity
40 bcm/y
29.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1220 mm (48 in)
Route
Torzhok-Minsk-Ivatsevichy Gas Pipeline runs from Torzhok to Ivatsevichy. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Torzhok
- To
- Ivatsevichy
- Start country
- Russia
- End country
- Belarus
- Countries crossed
- Russia, Belarus
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 838 km
- GEM pipeline ID
- P3483
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| I | Operating | Torzhok → Ivatsevichy | 851 | 40 | 1220 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Torzhok-Minsk-Ivatsevichy Gas Pipeline run?
- Torzhok-Minsk-Ivatsevichy Gas Pipeline runs from Torzhok to Ivatsevichy, crossing Russia and Belarus.
- How long is Torzhok-Minsk-Ivatsevichy Gas Pipeline?
- Torzhok-Minsk-Ivatsevichy Gas Pipeline is 851 km long.
- How much gas can Torzhok-Minsk-Ivatsevichy Gas Pipeline carry?
- Torzhok-Minsk-Ivatsevichy Gas Pipeline has a design capacity of 40 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Torzhok-Minsk-Ivatsevichy Gas Pipeline operating?
- Torzhok-Minsk-Ivatsevichy Gas Pipeline is operating, having started in 1974.
- Who owns Torzhok-Minsk-Ivatsevichy Gas Pipeline?
- Torzhok-Minsk-Ivatsevichy Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.