Gas transmission pipeline · Tivissa to Castelnou
Tivissa–Castelnou Gas Pipeline
Tivissa–Castelnou Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 91 km long, starting up in 1979. It runs from Tivissa to Castelnou. It is owned by Enagás SA.
Length
91 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
Tivissa–Castelnou Gas Pipeline runs from Tivissa to Castelnou. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tivissa
- To
- Castelnou
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 95 km
- GEM pipeline ID
- P3059
- Start year
- 1979
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Tivissa → Castelnou | 91 | Not reported | 762 mm | 1979 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Tivissa–Castelnou Gas Pipeline run?
- Tivissa–Castelnou Gas Pipeline runs from Tivissa to Castelnou, crossing Spain.
- How long is Tivissa–Castelnou Gas Pipeline?
- Tivissa–Castelnou Gas Pipeline is 91 km long.
- How much gas can Tivissa–Castelnou Gas Pipeline carry?
- No design capacity is reported for Tivissa–Castelnou Gas Pipeline. That is an absent figure, not a zero.
- Is Tivissa–Castelnou Gas Pipeline operating?
- Tivissa–Castelnou Gas Pipeline is operating, having started in 1979.
- Who owns Tivissa–Castelnou Gas Pipeline?
- Tivissa–Castelnou Gas Pipeline is owned by Enagás SA, as recorded in the current tracker release.