Gas transmission pipeline · Kensington Processing plant to Monroe County

Texas Eastern Transmission (TETCO) Gas Pipeline

Texas Eastern Transmission (TETCO) Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 122 km long and 5.62 bcm/y of capacity, starting up in 2015. It runs from Kensington Processing plant to Monroe County. It is owned by Enbridge Inc.

Length

122 km

Capacity

5.62 bcm/y

4.1 Mtpa LNG equivalent

Segments tracked

1

Route

Texas Eastern Transmission (TETCO) Gas Pipeline runs from Kensington Processing plant to Monroe County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kensington Processing plant
To
Monroe County
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
104 km
GEM pipeline ID
P0235
Start year
2015
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Ohio Pipeline Energy Network (OPEN) Gas PipelineOperatingKensington Processing plant → Monroe County1225.622015GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Texas Eastern Transmission (TETCO) Gas Pipeline run?
Texas Eastern Transmission (TETCO) Gas Pipeline runs from Kensington Processing plant to Monroe County, crossing United States.
How long is Texas Eastern Transmission (TETCO) Gas Pipeline?
Texas Eastern Transmission (TETCO) Gas Pipeline is 122 km long.
How much gas can Texas Eastern Transmission (TETCO) Gas Pipeline carry?
Texas Eastern Transmission (TETCO) Gas Pipeline has a design capacity of 5.62 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Texas Eastern Transmission (TETCO) Gas Pipeline operating?
Texas Eastern Transmission (TETCO) Gas Pipeline is operating, having started in 2015.
Who owns Texas Eastern Transmission (TETCO) Gas Pipeline?
Texas Eastern Transmission (TETCO) Gas Pipeline is owned by Enbridge Inc, as recorded in the current tracker release.