Gas transmission pipeline · Lüleburgaz to Baumgarten an der March
Tesla Gas Pipeline
Tesla Gas Pipeline is a cancelled gas transmission pipeline crossing Türkiye, Greece, Serbia and 2 more. The tracker lists 1 tracked segment, 1,400 km long and 27 bcm/y of capacity, starting up in 2019. It runs from Lüleburgaz to Baumgarten an der March. Owners include FGSZ, Srbijagas, MER JSC Skopje and 1 more.
Length
1,400 km
Capacity
27 bcm/y
19.9 Mtpa LNG equivalent
Segments tracked
1
Route
Tesla Gas Pipeline runs from Lüleburgaz to Baumgarten an der March. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Lüleburgaz
- To
- Baumgarten an der March
- Start country
- Türkiye
- End country
- Austria
- Countries crossed
- Türkiye, Greece, Serbia, Hungary, Austria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,622 km
- GEM pipeline ID
- P0762
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Lüleburgaz → Baumgarten an der March | 1,400 | 27 | — | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Alexandroupolis FSRU | Greece | Import | Operating | 12 km | route proximity |
| Thrace FSRU | Greece | Import | Proposed | 13.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.