LNG Chain

Gas transmission pipeline · Bangladesh

Tarakandi-Jamalpur Gas Pipeline

Tarakandi-Jamalpur Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 21 km long and 0.26 bcm/y of capacity, starting up in 1991. It is owned by Titas Gas Transmission and Distribution Co (TGTDCL).

Length

21 km

Capacity

0.26 bcm/y

0.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 152 mm (6.0 in)

Route

Tarakandi-Jamalpur Gas Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tarakandi
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
29 km
GEM pipeline ID
P0881
Start year
1991
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingTarakandi → ?210.26152 mm1991GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Tarakandi-Jamalpur Gas Pipeline run?
Tarakandi-Jamalpur Gas Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is Tarakandi-Jamalpur Gas Pipeline?
Tarakandi-Jamalpur Gas Pipeline is 21 km long.
How much gas can Tarakandi-Jamalpur Gas Pipeline carry?
Tarakandi-Jamalpur Gas Pipeline has a design capacity of 0.26 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Tarakandi-Jamalpur Gas Pipeline operating?
Tarakandi-Jamalpur Gas Pipeline is operating, having started in 1991.
Who owns Tarakandi-Jamalpur Gas Pipeline?
Tarakandi-Jamalpur Gas Pipeline is owned by Titas Gas Transmission and Distribution Co (TGTDCL), as recorded in the current tracker release.