Gas transmission pipeline · Tanjung Batu to Muara Badak

Tanjung Batu-Muara Badak Gas Pipeline

Tanjung Batu-Muara Badak Gas Pipeline is an operating gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 48 km long and 0.82 bcm/y of capacity, starting up in 2021. It runs from Tanjung Batu to Muara Badak. It is owned by Perusahaan Listrik Negara.

Length

48 km

Capacity

0.82 bcm/y

0.6 Mtpa LNG equivalent

Segments tracked

1

Route

Tanjung Batu-Muara Badak Gas Pipeline runs from Tanjung Batu to Muara Badak. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tanjung Batu
To
Muara Badak
Start country
Indonesia
End country
Indonesia
Countries crossed
Indonesia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
42 km
GEM pipeline ID
P0984
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingTanjung Batu → Muara Badak480.822021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Tanjung Benoa FSRUIndonesiaImportOperatingname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Tanjung Batu-Muara Badak Gas Pipeline run?
Tanjung Batu-Muara Badak Gas Pipeline runs from Tanjung Batu to Muara Badak, crossing Indonesia.
How long is Tanjung Batu-Muara Badak Gas Pipeline?
Tanjung Batu-Muara Badak Gas Pipeline is 48 km long.
How much gas can Tanjung Batu-Muara Badak Gas Pipeline carry?
Tanjung Batu-Muara Badak Gas Pipeline has a design capacity of 0.82 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Tanjung Batu-Muara Badak Gas Pipeline operating?
Tanjung Batu-Muara Badak Gas Pipeline is operating, having started in 2021.
Who owns Tanjung Batu-Muara Badak Gas Pipeline?
Tanjung Batu-Muara Badak Gas Pipeline is owned by Perusahaan Listrik Negara, as recorded in the current tracker release.
Does Tanjung Batu-Muara Badak Gas Pipeline serve an LNG terminal?
Tanjung Batu-Muara Badak Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.