Gas transmission pipeline · Przywodzie to Nowe Czarnowo
Szczecin - Lwówek to Dolna Odra Gas Pipeline
Szczecin - Lwówek to Dolna Odra Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 63 km long, starting up in 2023. It runs from Przywodzie to Nowe Czarnowo. It is owned by Gaz-System.
Length
63 km
Capacity
Not reported
Segments tracked
1
Largest diameter 700 mm (28 in)
Route
Szczecin - Lwówek to Dolna Odra Gas Pipeline runs from Przywodzie to Nowe Czarnowo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Przywodzie
- To
- Nowe Czarnowo
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 60 km
- GEM pipeline ID
- P2272
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Przywodzie → Nowe Czarnowo | 63 | Not reported | 700 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Szczecin - Lwówek to Dolna Odra Gas Pipeline run?
- Szczecin - Lwówek to Dolna Odra Gas Pipeline runs from Przywodzie to Nowe Czarnowo, crossing Poland.
- How long is Szczecin - Lwówek to Dolna Odra Gas Pipeline?
- Szczecin - Lwówek to Dolna Odra Gas Pipeline is 63 km long.
- How much gas can Szczecin - Lwówek to Dolna Odra Gas Pipeline carry?
- No design capacity is reported for Szczecin - Lwówek to Dolna Odra Gas Pipeline. That is an absent figure, not a zero.
- Is Szczecin - Lwówek to Dolna Odra Gas Pipeline operating?
- Szczecin - Lwówek to Dolna Odra Gas Pipeline is operating, having started in 2023.
- Who owns Szczecin - Lwówek to Dolna Odra Gas Pipeline?
- Szczecin - Lwówek to Dolna Odra Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.