Sturt Plateau Pipeline

Sturt Plateau Pipeline is a proposed gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 37 km long and 0.5 bcm/y of capacity, starting up in 2026. It runs from Shenandoah South Pilot Project to Amadeus Gas Pipeline. It is owned by APA SPP Pty Ltd.

Length

37 km

Capacity

0.5 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 305 mm (12 in)

Route

Sturt Plateau Pipeline runs from Shenandoah South Pilot Project to Amadeus Gas Pipeline. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Shenandoah South Pilot Project
To
Amadeus Gas Pipeline
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
55 km
GEM pipeline ID
P5977
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedShenandoah South Pilot Project → Amadeus Gas Pipeline370.5305 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sturt Plateau Pipeline run?
Sturt Plateau Pipeline runs from Shenandoah South Pilot Project to Amadeus Gas Pipeline, crossing Australia.
How long is Sturt Plateau Pipeline?
Sturt Plateau Pipeline is 37 km long.
How much gas can Sturt Plateau Pipeline carry?
Sturt Plateau Pipeline has a design capacity of 0.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sturt Plateau Pipeline operating?
Sturt Plateau Pipeline is proposed, with a reported start year of 2026.
Who owns Sturt Plateau Pipeline?
Sturt Plateau Pipeline is owned by APA SPP Pty Ltd, as recorded in the current tracker release.