Gas transmission pipeline · Srednebotuobinskoye Gas and Condensate Field to Lensk
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 207 km long and 1.45 bcm/y of capacity, starting up in 2028. It runs from Srednebotuobinskoye Gas and Condensate Field to Lensk. It is owned by Alrosa-Gas JSC.
Length
207 km
Capacity
1.45 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 530 mm (21 in)
Route
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline runs from Srednebotuobinskoye Gas and Condensate Field to Lensk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Srednebotuobinskoye Gas and Condensate Field
- To
- Lensk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 206 km
- GEM pipeline ID
- P6682
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Srednebotuobinskoye Gas and Condensate Field → Lensk | 207 | 1.45 | 530 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Alrosa-Gas JSC100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline run?
- Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline runs from Srednebotuobinskoye Gas and Condensate Field to Lensk, crossing Russia.
- How long is Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline?
- Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is 207 km long.
- How much gas can Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline carry?
- Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline has a design capacity of 1.45 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline operating?
- Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is proposed, with a reported start year of 2028.
- Who owns Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline?
- Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is owned by Alrosa-Gas JSC, as recorded in the current tracker release.