Gas transmission pipeline · Nevada to Nevada
Spring Creek Gas Infrastructure Expansion Project
Spring Creek Gas Infrastructure Expansion Project is an under construction gas transmission pipeline in United States. The tracker lists 1 tracked segment, 35 km long, starting up in 2027. It runs from Nevada to Nevada. It is owned by Southwest Gas Holdings Inc.
Length
35 km
Capacity
Not reported
Segments tracked
1
Route
Spring Creek Gas Infrastructure Expansion Project runs from Nevada to Nevada. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Nevada
- To
- Nevada
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 19 km
- GEM pipeline ID
- P7823
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Backbone | Under construction | Nevada → Nevada | 35 | Not reported | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Spring Creek Gas Infrastructure Expansion Project run?
- Spring Creek Gas Infrastructure Expansion Project runs from Nevada to Nevada, crossing United States.
- How long is Spring Creek Gas Infrastructure Expansion Project?
- Spring Creek Gas Infrastructure Expansion Project is 35 km long.
- How much gas can Spring Creek Gas Infrastructure Expansion Project carry?
- No design capacity is reported for Spring Creek Gas Infrastructure Expansion Project. That is an absent figure, not a zero.
- Is Spring Creek Gas Infrastructure Expansion Project operating?
- Spring Creek Gas Infrastructure Expansion Project is under construction, with a reported start year of 2027.
- Who owns Spring Creek Gas Infrastructure Expansion Project?
- Spring Creek Gas Infrastructure Expansion Project is owned by Southwest Gas Holdings Inc, as recorded in the current tracker release.
- Does Spring Creek Gas Infrastructure Expansion Project serve an LNG terminal?